The weekends are starting to fly by (as if they did not pass fast enough). We have been working on Sloth non-stop. Kudos to Kurt for perservering WAY past me. This weekend we reset the back seat (had to find the screw holes), soundproofed the doors, rustproofed and soundproofed the front floor, and Kurt installed relays for the headlights. Kurt studied the diagrams and figured out the wiring (it was a rat's nest) and then rewired a number of things and installed relays for the headlights (they required more amperage). The only thing that I helped with was identifying the colors of the wires (color blind). He continued to explain the schematic and how it all worked to me (kind of him) but it was as useful as me trying to explain differential equations to him. He will be posting his schematic of how he did the relays (quite clever) when he is done drawing them out. For now here are some pictures of our work:
This album is powered by BubbleShare - Add to my blog
Sunday, June 3, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment